Contracting & project execution — 02
Bish Dam to Al-Fudayhah Desalination Plant Transmission Line
- Location
- Jazan Region
- Project type
- Infrastructure — Water Transmission
- Supervision
- Eng. Issa Mahmoud Al-Darwish
About the project
A project focused on the infrastructure of water transmission mains, running from Bish Dam to the Al-Fudayhah desalination plant. Execution relied on modern equipment and techniques to reach the highest efficiency, under the supervision of consultants and experts.
Scope of work
- 01Infrastructure works for water transmission mains
- 02Route excavation and trench bedding
- 03On-site pipe laying and jointing
- 04Use of modern equipment and techniques
Engineering approach
- Water transmission mains executed to project requirements
- Modern equipment and techniques deployed to raise efficiency
- Route levels set and the trench prepared ahead of laying
From site
Let's begin
Your project's requirementsstart here.
Whether you're looking for an execution partner, need building materials supplied, or want support for running your project, get in touch with the Sakhr Al-Hijaz team.